In this job, I constructed a complete basement bathroom with a new shower, schluter membrane installed for the entire shower, new toilet, vanity, medicine box, electrical, and bath fan. I got the electrician to run the wires for the bathroom. I should have started out by saying this was the vacant basement I worked on to do the underground plumbing you saw in the previous project. The vacant basement / bathroom area had to be framed and insulated, first off. Then, I got into the drywalling, tiling, installing door frames, painting, etc. I only have a couple of photos of the bathroom. To show it off properly, I took a video of the finished work